

STEP 01Copper conductor and PVC compound checked at the gate — verified suppliers, batch records kept.
STEP 02Automatic extrusion lines put the insulation and sheath on, meter by meter, day and night shifts.
STEP 03Pair twisting and multi-core stranding with controlled lay length for stable electrical performance.
STEP 04Every spool gets spark test and continuity check; patch cords pass Fluke-style channel testing.
STEP 05Boxed, labeled and palletized — your brand on the box if you order OEM, export cartons as standard.
STEP 06Ready stock for fast-moving models, mixed loading into one container, container loading supervised on camera.
Main production hall
Extrusion workshop
Cable lines, night shift
Spool & drum storage
Drawing & annealing
Pay-off & take-up stands
Finished-goods warehouse
Packed & ready to load


Tell us what you're sourcing — a real engineer answers with price and lead time.
Loading coupons...
WhatsApp us